BMC Water Supply Tunnel Ka Break Through Kiya Gaya, Wadala Se Parel Ke Beech 5.25 Km Long Underground Tunnel
BMC Ne Amar Mahal Se Wadala Aur Wadala Se Parel Ke Beech 9.7 Km Lamba Underground Water Tunnel Banane Ka Kaam Shuru Kiya Hai.
View this post on Instagram
Iss Project Ke 2nd Phase Me Wadala Se Parel Ke Beech 5.25 Km Long Underground Tunnel Ka Kal Friday 21 June Ko Break Through Kiya Gaya.
Iss Mauqe Par BMC Commissioner, Administrator Bhushan Gagrani, Additional Municipal Commissioner (Projects) Abhijit Bangar, Deputy Municipal Commissioner (Special Engineering) Chakradhar Kandalkar Sahit Aur Bhi Log Maujood They.
Tunnel Ka 74% Kaam Poora Hoagya Hai, Iss Water Tunnel Se F North (Matunga, Wadala Area), F South (Parel) Aur E Ward (Byculla) Ke Kuch Areas Ke Sath L (Kurla) Wards Ke Logon Ko Sufficient, High-Pressure Se Water Supply Hoga.