All NewsBreaking NewsMumbai

Dadar Station Se Travel Karne Walon Ke Liye Khabar, WR Platform No. 4 Ke Foot Over Bridge Ka North Side Staircase Bandh Hoga

Dadar Station Se Travel Karne Walon Ke Liye Khabar, WR Platform No. 4 Ke Foot Over Bridge Ka North Side Staircase Bandh Hoga

 

View this post on Instagram

 

A post shared by Gallinews India (@gallinews_com)

Western Railway Ne Bataya Ke Mumbai Local Ke Dadar Station Par Platform No. 4 Par Bane Foot Over Bridge Ke Repair Ka Kaam Kiya Jaana Hai, Jiske Chalte Bridge Ke North Side Ka Staircase Qareeb Dedh Mahina Bandh Rahega.

Railway Ne Di Jaankari Ke Anusar, Dadar Station Platform No. 4 Foot Over Bridge Ka North Side Staircase 15th/16th March 2025 Se 30 April 2025 Tak Bandh Rakha Jayega.

Western Railway Ne Dadar Station Platform No. 4 Se Travel Karne Walon Ko Appeal Kiya Hai Ke Platform No. 4 Foot Over Bridge Ka North Side Staircase Bandh Rehne Ke Period Me Log Dusra Staircase Use Kar Sakte Hain.

DadarStation, MumbaiLocal, WesternRailway, RailwayUpdate, FootOverBridge, MumbaiNews, LocalTrainUpdate, TrainTravel, DadarFOB, WRNews, MumbaiUpdates, TrafficAlert, RailwayRepair, MumbaiCommuters, PublicNotice, RailwayInfrastructure, MumbaiLife, TrainDelay, LocalTrainNews, CityUpdates

Related Articles

Leave a Reply

Back to top button

Discover more from Gallinews India

Subscribe now to keep reading and get access to the full archive.

Continue reading